Process/Petrochemicals
The construction, expansion, or refurbishment of refineries, chemical plants, and alternative fuel facilities.
-
Cargill
Tons: 15,000+
Location: Blair, Nebraska
Plant expansions and steel construction (over 15,000 tons), and rough set of equipment up to 100 tons.
-
Clark Refining
Tons: 3,500
Location: Port Arthur, Texas
Construction of a six-drum coker unit with derricks and pipe rack structures. Preassembled coke chutes, coker structure, derricks, and cutting decks, and constructed them with a 2,000-ton Demag crawler crane.
-
Mitsubishi
Location: Theodore, Alabama
Process structures and pipe rack for polycrystalline plant.
-
North American Salt
Location: New Johnsonville, Tennessee
Process structure.
-
Panda Ethanol
Ton: 1,000
Location: Hereford, Texas
Process structures and pipe racks for ethanol plant, including rough setting 62 pieces of equipment weighing up to 60 tons.
-
Valero Refining
Location: Texas City, Texas
Coke chutes and pipe rack.
-
Wellman of Mississippi
Location: Bay St. Luis, Mississippi
Grassroots chemical plant.
-
Formosa Plastics
Ton: 53,000+
Location: Point Comfort, Texas
Grassroots chemical plant (over 18,000 tons) and plant expansions (35,000 tons to date), including numerous process structures, SPVC plant addition, Olefins III plant addition, HDPE # 3 plant addition, LDPE plant addition, EG2 plant addition, UT3 plant addition, silo and dryer structure, and pipe racks.
-
Nan Ya Plastics
Ton: 4,000
Location: Lake City, South Carolina
Process structures and pipe rack totaling 4,000 tons.
-
DSM Chemicals
Location: Augusta, Georgia
Process structures for plant expansion.