Testimony 04

Posted on: August 20th, 2015 by Austin Beckner

PBI provided valuable information regarding connection geometries, methodologies, and tolerances to increase constructability and to reduce construction time and cost. This effort resulted in the total cost of the erected structural steel being held within a budget that was established months before the design was finalized. PBI also accomplished the erection of this steel within a tolerance of ½” in all directions – an amazing feat.

Comments are closed.